Scroll to top
Back
Homepage stories More success stories

Interislander Ferry Kaiarahi – Gearbox Monitoring

  • Completion date: August 2022

  • Track record: System met client needs. Installation performed within tight timeframe and limited on-site resources. Several scope changes during project development accommodated. Client is happy and system continues in operation.

Scroll

AFI are the preferred system integrators for the Interislander Vessels.

After the failure of a main engine gearbox bearing, AFI were approached to provide a system to detect early signs of bearing failure through temperature and lubrication oil monitoring. A full system was designed, in collaboration with InTech instrumentation, to monitor 16 temperature probes and an oil quality monitor on each gearbox. The PLC was set up to communicate to two ethernet connected analog multiplexers and two RS485 connected oil quality monitors. A panel PC running AVEVA Edge provided visualisation and alarming for engineers in the engine control room.

Services provided
  • Collaborate with on-board engineers to ensure minimal disruption to ship services
  • Supply and program PLC and HMI hardware
  • Commission standalone network between multiplexers, PLC, and HMI
  • FAT / SAT / Commissioning / On-site Support
Product description
  • Schneider M221 PLCs
  • Schneider AVEVA Edge HMI/SCADA
  • Advantech Network Switches
  • Advantech Panel PC
  • Allen Bradley Flex I/O
  • Siemens Simatic PLC