South Island WTP Upgrade

  • Completion date: June 2017

  • Track record: EFFECTIVE PROJECT MANAGEMENT ENSURED THAT THIS PROJECT WAS SUCCESSFULLY COMPLETED ON TIME AND WITHIN THE CLIENT’S BUDGET. THE CLIENT WAS VERY HAPPY WITH THE RESULT, AND THIS LED TO THE UPGRADE OF ADDITIONAL WASTEWATER TREATMENT PLANTS AND THE THREE WATERS RETICULATION NETWORKS FOR THIS COUNCIL.

Scroll

AFI is the preferred automation supplier for the City Council.

The Water Treatment Plant was upgraded and refurbished to ensure compliance with the New Zealand Drinking Water Standards. This included a total upgrade of the electrical and controls systems, replacement of all chemical dosing sub-systems, a new UV disinfection unit, and the addition of GAC filtering and backwash water handling. New council-wide PLC and SCADA standards were developed and implemented, which were later rolled out to all other plants and pump stations.

Services provided
  • Reviewed and amended the functional design specifications.
  • Specified and selected all automation equipment.
  • Developed all PLC software.
  • Developed the redundant SCADA system.
  • FAT / Commissioning / SAT / Remote Support.
  • SCADA standards documentation
Product description
  • Schneider M580 Redundant PLC – including remote I/O on Ethernet with 1600 I/O Points.
  • ArchestrA / System Platform SCADA.
  • Wonderware Historian.